HVAC Design & Installation

Mary Star High School

This Method Mechanical & Metal project consisted of installing a new air conditioning system for a two-story, 37,000 square feet, classroom and administration building. Additionally there is also a 10,000 sqare feet gym and locker facility. Method Mechanical & Metal installed all the air conditioning and ventilation systems for this facility, with a system redesign that saved $85,000 of initial costs.

Have an HVAC Design & Installation Project?