HVAC Design & Installation
Le Lycée François High School
Le Lycée, an existing French high school, acquired property to build this new 40,000 square feet school. Based on Method Mechanical & Metal’s redesign and installation work, the heating, ventilating and air conditioning (HVAC) costs were reduced from 1.5M to 1.15M enabling them to complete the 15M building in 2009. Method Mechanical & Metal has provided ongoing heating, ventilating and air conditioning (HVAC) maintenance ever since.
Have an HVAC Design & Installation Project?







